Mass Driver 2 Final Report Part 1 - NASA/SSI

Final circuit boards were assembled and installed into the electronics housings. The alignment and testing of the installed circuit boards is shown in Fig. 2.10. Fig. 2.10 Alignment and testing of optical and SCR trigger circuit boards in phase two.

RkJQdWJsaXNoZXIy MTU5NjU0Mg==