Summary of Sensitivity Results by Case Case 4: GEO-Based SolarDisc (60 Satellites). The GEO-Based, 5 GW power output, SolarDisc was found to be relatively insensitive to changes in the ETO costs below about $500/Ib, but was quite sensitive to changes in price to values above about that level Case 4, potentially as result of ETO cost factors, was similarly found to be quite sensitive to reductions below about 5 years for space segment refurbishment, but to be relatively insensitive changes above 10 years. Figures 6-16 through 6-18 which follow, provide the details of Case 4 sensitivities to the variations in ETO costs as summarized above. Figure 6-16 IRR Sensitivity to ETO Cost
RkJQdWJsaXNoZXIy MTU5NjU0Mg==