For the specific set of assumptions which define the Initial Operational System and the Final Operational System, the data points are plotted on the figures for reference. If the 95 percent utilization was used it would give an initial system energy cost of 62 mils/kW hr and a final system energy cost of 43 mils/kW hr. Although the average of these is 52 mils/kW hr, the average over a fleet of 100 should approach the goal of 43 mils/kW hr.