The cost of the transportation and assembly of both the power source and the MPTS system would be proportional to their weights. J. 4 WEIGHT AND COST ANALYSIS FOR THE INITIAL AND FINAL OPERATIONAL SYSTEMS
RkJQdWJsaXNoZXIy MTU5NjU0Mg==