13.3.2 Phase I 13-5 13.3.3 Phase II 13-5 13.3.4 Phase III 13-9 13.3.5 Alternate Phase I Converter Implementation 13-11 13.4 Critical Technology Development 13-14 13.4.1 Amplitron 13-14 13.4.2 Klystron 13-14 13.4.3 Phase Control 13-14 13.5 Schedule and Cost 13-15 13.6 Conclusions and Recommendations 13-17 14. CRITICAL TECHNOLOGY AND ORBITAL TEST PROGRAM 14.1 Orbital Test Objectives 14-1 14.2 Implementation 14-3 14.2.1 Geosatellite (Mission 1) 14-4 14.2.2 Shuttle Sorties (Missions 2 through 11) 14-4 14.2.3 Orbital Test Facility 14-23 14.3 Cost and Schedule 14-25 14.4 Conclusions and Recommendations 14-30 APPENDIX H - ESTIMATED ANNUAL OPERATIONS AND MAINTENANCE COST (5 GW System) H-l APPENDIX I - ANNUAL OPERATIONS AND MAINTENANCE COST (10 GW System) I-1 APPENDIX J - SYSTEM ANALYSIS EXAMPLES J. 1 Introductory Analysis of Initial Operational System With Minimum Size Transmitting Antenna J-1 J.2 Analysis of the Final Operational System and Their Goals J-10 J.3 Analysis of the Initial Operational System Based On the Final System Configuration J-21 J.4 Weight and Cost Analysis for the Initial and Final Operational Systems J-25 J.5 Energy Cost J-27
RkJQdWJsaXNoZXIy MTU5NjU0Mg==