The Colonization of Space Physics Today Sept 1974

timum design and course of action can only be decided on after study and consultation among experts in a number of fields. The nominal values for the first model colony are taken as: construction force, 2000 people; population, 10 000; total mass, 500 000 tons. When the design and cost analysis are done in detail for the entire enterprise, the need to fit a budget may force some reduction in size. The initial estimates have been aimed at holding the cost equal to that of one project we have already carried through: Apollo. The choice of 10 000 as a target population ensures that, even with some reduction, Model 1 will be large enough to obtain economies of scale and to serve as an effective industrial base for the construction of Model 2. A much reduced colonization project would be little more than a renamed space station, perhaps able to maintain itself but incapable of building the larger models that are necessary if the program is ultimately to support itself. It is an essential feature of the colonization project that Earth should no longer have to support it after the first two or three stages. Ultimately, colonization could take place in the entire sphere, 3 X 1017 km2 in area, that surrounds the Sun at the distance we have evolved to prefer (the so-called “Dyson sphere”). For the first colony it is probably best to choose a particular point on that sphere, within easy range of both Earth and Moon, not so close as to be eclipsed often, and preferably stable against displacements in all three coordinates. The L4 and L5 Lagrange libration points satisfy all these conditions. They have the further advantage of forming only a very shallow effective-potential well.11 Earth, Moon, Sun and the colony form a restricted four-body gravitational problem, for which the full solution has only been worked out within the past several years.12 The stable motion is a quasielliptical orbit, of large dimensions, about L5. The maximum excursions in arc and radius are several tenths of the Earth-Moon distance. On the stable orbit there is room for several thousand colonies; a long time will pass before colonization can fill so big an orbit. Cost minimization There are several key problems involved here, each of which appears to yield to an efficient solution in principle: reducing freight-shipment cost from the Earth to L5, the colony site; minimizing the mass needed from Earth; designing a device for low-cost transfer of materials from the Moon to l5. The first problem was considered by Robert Wilson (NASA), Eric Hannah and George Hazelrigg (Princeton) at a meeting held 9 and 10 May at Princeton (A Proceedings of this meeting will be published). Their conclusion was that the best method during the 1980’s will probably be conventional chemical rockets—specifically, the high-quality engines already being developed for the space shuttle. Among several variations possible, the common feature was reusability, and the cost estimates for shipment varied from $190 to $400 per pound, in 1972 dollars. The cost summary table (Table 4) therefore assumes $425 per pound. To reduce the mass needed from Earth, most of the repetitive structural members (aluminum) and window panels (glass) must be produced at L5 from lunar material. A further, important saving is made by getting 89% of the mass of needed water from oxygen in the plentiful lunar-surface oxides, bringing only 11% of the water mass as liquid hydrogen from Earth. Of the 500 000-ton total mass (see Table 2) for the Model 1 colony, 98% can be obtained from the Moon. The elements most needed are aluminum, titanium, silicon and oxygen. Lunar surface soil is usable for agriculture, with the addition of nitrates and small amounts of trace elements. The remaining 10 000 tons must come from the Earth. To bring the total cost within practical limits, we must develop a low-cost method for transporting raw materials from the Moon to the construction site. The discussion of transport methods should be taken as an existence proof rather than as a detailed design. There may very well be better methods than those I have considered; however, it is enough to show two solutions that appear to be workable. Both use the two great advantages of the lunar environment: an excellent vacuum and a very low escape velocity, about 1.5 miles per sec, less than one quarter of the escape velocity from Earth. To bring a kilogram to L5 from the Moon takes less than 5% of the energy needed to take a kilogram from Earth. Both methods assume electric power from a conventional steam-electric power plant that uses solar energy, and both assume that the system runs only during the lunar day, the night being used for scheduled maintenance, crew rest and possibly materials processing. I have also assumed another factor of two lost to system breakdowns. Overall then, each system is assumed to be running only one week in four. The first method, called “RPL” for rotary pellet launcher, is a symmetric, two-arm propeller-like device, running at constant speed. (See box on page 38 for description). To transfer 500 tons in six years, about 26 such RPL’s would be needed, for a total power of 32 MW. Precise steering is carried out by a linear electromagnetic deflection-plate system after the launching, to hold down the pellet dispersion and permit easy collection. The alternative method, called “TLA” for transport linear accelerator, uses the technology of dynamic magnetic levitation and the linear synchronous motor. The TLA is a recirculating system of small, passive vehicles (buckets), each having no moving parts but containing superconducting coils. The bucket accelerates a 9-kg payload to escape speed along a magnetic-levitation, linear-synchronous track. Deceleration then releases the payload, the bucket slows to a moderate speed, and is recirculated to receive another payload. Table 3 shows some guideline parameters. The mass estimate is 1500 tons, of which about 80% is in power-generation and power-handling equipment. In six years, running 25% of the time, the TLA can transport over 300 times its own weight. (For a short bibliography of early work on the possibilities of electromagnetic launching, before the development of dynamic magnetic levitation, see reference 13.) Both RPL and TLA may have eventual applications as high-throughput, energetically efficient reaction motors, running on solar power and able to use any kind of asteroidal debris as reaction mass. They could propel very large payloads, in the million-ton range or Rotary pellet launcher The rotary launcher is assumed to be a symmetric two-arm propeller-like device, running at constant speed, with launching arms of ten-meter radius.

RkJQdWJsaXNoZXIy MTU5NjU0Mg==